New 132kV Network rail substation phased work construction of new substation, site comprising control room building customer metering annex and structure bases
Trial hole excavations for live existing u/g services
Piling works to footprint of building
Excavation for ground floor slab
Construction of concrete base slab and up stand wall
Brick and block cavity superstructure wall construction
Fixing timber roof trusses
Roof tiling sub-contractor
Painting
Installation of concrete planks sub-contractor
M&E installation sub-contractor
Installation of external security doors sub-contractor
Excavation and installation of new L.V trench with associated ducting and draw pits
Fixing of new internal Structural secondary steelwork beams
Erection of galvanised hand railing system
New Access Road