Client: Northern Powergrid

Value: £1M

Project Description:

New 132kV Network rail substation phased work construction of new substation, site comprising control room building customer metering annex and structure bases

Works Included:

  • Trial hole excavations for live existing u/g services
  • Piling works to footprint of building
  • Excavation for ground floor slab
  • Construction of concrete base slab and up stand wall
  • Brick and block cavity superstructure wall construction
  • Fixing timber roof trusses
  • Roof tiling sub-contractor
  • Painting
  • Installation of concrete planks sub-contractor
  • M&E installation sub-contractor
  • Installation of external security doors sub-contractor
  • Excavation and installation of new L.V trench with associated ducting and draw pits
  • Fixing of new internal Structural secondary steelwork beams
  • Erection of galvanised hand railing system
  • New Access Road