Client: NPG / Integrated Utility Services Limited

Value: £2.3m

Project Description:

Phased civil works associated with a new incoming substation and customer Gas Processing Plant Substation site including, piling works, control/switch room buildings, transformer bunds, isolated equipment foundations, cable troughs, underground ductwork, draw pits, drainage, access roads, fencing and associated site works.

Works Included:

  • General building works to Substation Buildings

  • Perform UXB survey prior to works commencing

  • Preparatory works to existing structures

  • Piling to Switch & Control room building

  • Construction of new reinforced concrete foundation plinths for prefabricated substation units

  • Substation compound infrastructure including transformer support plinths and oil containment bunds, internal roads, drainage
  • Installation of steelwork superstructure
  • Brick & Block work
  • Installation of Roof Trusses
  • External vertical & Roof cladding

  • Construction of Transformer Bunds

  • Trench pipe way pits
  • Access roads, boundary fences, general site works
  • Ducting for HV cabling
  • M&E Works
  • Precast cable troughs
  • Invasive species removal
  • Replacement of high resistivity surface dressings
  • Demolition of redundant building and OH support structures
  • Earth mat upgrades
  • Retaining structures
  • Gated palisade Fencing
  • External security Lighting